
Asbestos Decommissioning and Removal
Asbestos dismantling and removal work is done from buildings or facilities.
This is a construction project that safely and systematically demolishes areas where asbestos was used.

Curing Work
This involves covering both walls and floors with opaque asbestos vinyl to prevent asbestos dust from leaking outside.

Installation of sanitary facilities
Sanitary equipment is required for asbestos workers to clean inside and outside the workplace.
Allow entry and exit and prevent asbestos dust inside.
This is a facility that can prevent scattering to the outside.

tex demolition
It looks like asbestos-containing textiles are being dismantled.
When working with asbestos, wear a one-piece dust suit and dust mask before dismantling.

Air pressure, smog test
The negative pressure machine adjusts the internal negative pressure to reduce the noise generated in the workplace.
Prevents dust and dust from leaking out and measures asbestos concentration
It operates continuously until the level falls below the standard value.

waste disposal
Before the removed asbestos-containing materials are dried, they are sealed and packaged in impermeable plastic bags, and a warning sticker is attached to the asbestos waste before being disposed of.

cleaning up debris
Asbestos residues can be cleaned with a vacuum cleaner equipped with a high-performance HEPA filter or with a wet mop.