top of page

Dismantling indoor architectural structures

Before Work
The exterior of a building requiring dismantling of the interior structure.

Before
Interior of a warehouse building with a basement, first, and second floor structure

Under construction
Dismantling and moving the internal ventilation structure on the first floor

Under construction
Dismantle the 2nd floor floor slab and remove the waste.
Preparing to remove floor beams

Waste disposal
Waste produced after interior demolition work is
After collection, disposal or recycling is carried out by a designated company.
bottom of page